Underlayment & Ice Barrier Calculator

How many rolls of underlayment and ice-and-water shield to buy, using published coverage and the code eave rule.

Roof area

Use the roof area calculator if you still need this number.

Default is GAF FeltBuster, 1,000 sq ft.

Ice barrier (eaves)

A simple gable has two eaves.

IRC R905.1.2 uses 24 inches, measured horizontally.

Add this if you want the 24 inches to start from the interior face of the wall.

Default is a GAF WeatherWatch 2-square roll, 200 sq ft.

Enter your measurements and tap Calculate to see the result.

How to measure

Start with the roof’s surface area, from the area calculator or from planes you already measured. For the ice barrier (definition), measure each eave’s length, the overhang from the wall to the fascia, and the roof pitch (definition). The code distance is 24 inches inside the exterior wall line, measured horizontally. This calculator adds the overhang (and, if you enter it, the wall thickness) to that 24 inches, then multiplies by the pitch multiplier to get the distance up the slope. Multiply that slope depth by the total eave length to get the membrane area.

How the rolls are counted

Underlayment (definition) is counted on the roof area that is not already covered by the ice barrier, because the code uses the ice barrier in place of normal underlayment in that zone. Each roll total is the area, plus your waste percentage for laps and cuts, divided by the published coverage excluding laps, then rounded up.

Worked example: a 40-foot eave, 12-inch overhang, 24 inches inside the wall, and a 6:12 pitch. The horizontal distance is 36 inches, or 3 feet. The slope depth is 3 × 1.118 ≈ 3.35 feet (about 40.3 inches). Two eaves on a simple gable give about 268 square feet of ice barrier. At 200 square feet per roll and no waste, that is 2 rolls (268 ÷ 200, rounded up). A 2,400-square-foot roof then needs underlayment on the remaining 2,132 square feet; with 10 percent waste and 1,000-square-foot rolls, that is 3 rolls (2,345.2 ÷ 1,000, rounded up).

Valleys, walls, and skylights often get extra membrane that this eave-only estimate does not include. Add those lengths as extra area or a higher waste percentage. Results are planning estimates. Confirm coverage, nail patterns, and installation details with the manufacturer's instructions, and check your local building code. This tool is not a substitute for a licensed roofer or a permit review.

How many rolls of underlayment and ice barrier do I need?

Cover the roof surface with underlayment, minus the eave strip already covered by ice-and-water shield so you do not double-count that area. GAF FeltBuster is listed at 1,000 square feet (10 squares) per 48-inch by 250-foot roll, excluding laps. For the ice barrier, the IRC requires the membrane to extend from the eave edge to at least 24 inches inside the exterior wall line; this calculator adds the overhang and, if you enter it, the wall thickness, then multiplies by the pitch multiplier to get the distance up the slope. GAF WeatherWatch is listed at 150 square feet for a 1.5-square roll and 200 square feet for a 2-square roll, excluding laps. Add a waste allowance, and add valley or wall membrane separately if you need it.

Frequently asked questions

How far up the roof does ice-and-water shield have to go?

The International Residential Code (R905.1.2) requires the ice barrier, in areas where ice dams are designated, to run from the lowest roof edge to a point at least 24 inches inside the exterior wall line. That 24 inches is measured horizontally, so on a pitched roof the membrane must travel farther up the slope than 24 inches. A single 3-foot roll is often not enough once you add the overhang. Some jurisdictions also require at least 36 inches along the slope on roofs of 8:12 or steeper; use the optional checkbox if that is your local rule.

Does the ice barrier replace underlayment at the eaves?

Yes. The code says the ice barrier is used in place of normal underlayment in that zone. This calculator subtracts the ice-barrier area from the roof area before counting underlayment rolls.

How much coverage is in a roll?

GAF FeltBuster synthetic underlayment is published at 1,000 square feet per roll, excluding laps. GAF WeatherWatch ice barrier is published at 150 square feet for a 1.5-square roll (36 in. × 50 ft.) and 200 square feet for a 2-square roll (36 in. × 66.7 ft.), excluding laps. The defaults here are 1,000 and 200. Add a waste percentage for side laps and cuts.

Do I need an ice barrier in a warm climate?

Only where the code or your local table requires it — typically where there is a history of ice forming along the eaves. Detached unconditioned accessory buildings are often excepted. Check with your building department.

How many rolls of underlayment for a 20-square roof?

Twenty squares is 2,000 square feet of roof surface. A 1,000-square-foot synthetic roll such as GAF FeltBuster, with 10 percent waste and no ice-barrier credit, is about 2,200 square feet of material, or 3 rolls after you round up. If ice barrier covers the eaves, subtract that area first — this calculator does that when you enter the eave length. Count drip edge separately in the drip-edge calculator.

Results are planning estimates. Confirm coverage, nail patterns, and installation details with the manufacturer's instructions, and check your local building code. This tool is not a substitute for a licensed roofer or a permit review.